Fibre installation: the connection steps, from order to speed test

By The SpeedFibre team, updated . 3 min read.

Fibre installation: the connection steps, from order to speed test
In short After ordering, a technician pulls the fibre from the connection point to your home, installs an optical socket and sets up the router. On the day, check the quality of the work and run a fibre speed test over cable before the technician leaves.
Contents
  1. Step 1: the order
  2. Step 2: the technical visit
  3. Step 3: cable routing and optical socket
  4. Step 4: router and activation
  5. Step 5: checks before the technician leaves
  6. After installation

A fibre (FTTH) connection is a short but technical job. Preparing well avoids a second visit and later drop-outs.

Step 1: the order

First check on your provider's website that fibre is available at your address, then subscribe online, in a shop or by phone. The provider calls back to book an appointment.

Step 2: the technical visit

The technician locates the optical connection point (in the street, on the façade or in the building) and the route to your home: existing duct, riser, conduit. Make sure common areas are accessible and, if needed, get the building manager's approval.

Step 3: cable routing and optical socket

The fibre is pulled to your home and connected to an optical termination socket (PTO). Choose its location carefully: ideally in the middle of the home, near a power socket, and not inside a metal cabinet. Your Wi-Fi will start from there: see where to place your router.

Step 4: router and activation

The router (or ONT + router) connects to the PTO with an optical patch cord. The PON light should be steady and the LOS light off. A red LOS light signals a signal problem: see red LOS light.

Step 5: checks before the technician leaves

  1. Connect a computer over Ethernet cable and run a speed test.
  2. Check the optical cord is neither bent nor crushed: fibre does not like tight bends.
  3. Test Wi-Fi in the main rooms.
  4. Note the Wi-Fi name and change the default password: secure your Wi-Fi.

After installation

Watch the line for a few days: evening speed, possible drop-outs. If something is wrong, our Wi-Fi or line diagnosis tells you where it comes from, and your saved test results will support any request to your provider.

#FiberSpeedTest#Troubleshooting

Sources and further reading

Frequently asked questions

How long does installation take?

The work itself often takes one to two hours when the cable route is available. It can take longer if routing works are needed.

Do walls need drilling?

Sometimes, to bring the cable to the chosen room. The technician prefers existing ducts; agree on the route before work starts.

Can I move the optical socket later?

Possible but delicate: fibre must be handled carefully. Better to choose the location well from the start, or extend the network with Ethernet or Mesh.

The SpeedFibre team Guides written and reviewed by a telecom engineer specialised in fibre optics (FTTH), with more than 8 years of hands-on network maintenance and measurement. Editorial policy.